Refine results
Level of study
Location
Study Mode
Field of study
Conduct site survey for off-grid photovoltaic/generating set systems - UEERE0055
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery
Conduct site survey for off-grid photovoltaic/generating set systems - UEERE0055
- SEVENTEEN MILE ROCKS - 184 Bluestone Cct | Also at 1 other campus
- 1 weeks full-time
Conduct site survey for grid-connected photovoltaic and battery storage systems - UEERE0054
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery
Conduct site survey for grid-connected photovoltaic and battery storage systems - UEERE0054
- SEVENTEEN MILE ROCKS - 184 Bluestone Cct | Also at 1 other campus
- 30 hours flexible delivery
- Tuition fees: $880
Design off-grid photovoltaic/generating set systems - UEERE0063
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery
Install off-grid power conversion equipment to electrical installation - UEERE0079
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery
Design grid-connected photovoltaic power supply systems - UEERE0061
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery
Design grid-connected battery storage systems - UEERE0060
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery
Install photovoltaic power conversion equipment to grid - UEERE0080
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery
Design grid-connected photovoltaic power supply systems - UEERE0061
- SEVENTEEN MILE ROCKS - 184 Bluestone Cct | Also at 1 other campus
- 1.5 weeks full-time
- Tuition fees: $880