Type of institution: Registered Training Organisation Level: Pre-degree CRICOS:
This unit is part of the Construction, Plumbing and Services Training Package. It specifies the outcomes required to plan, size and document a consumer's gas installation, including consumer piping operating up to a pressure of 200kPa, fluing, ventilation and appliance installation associated with natural gas (NG), simulated natural gas (SNG), liquefied petroleum gas (LPG) and tempered liquefied petroleum gas (TLPG) for a building of minimum four floors and multiple buildings supplied through one gas source (billing meter or storage tank). It covers preparing for work, determining gas installation requirements, detailed planning of the layout and completing work finalisation processes, including records and documentation. Work associated with this unit is undertaken within the scope of AS5601 (AG601) Gas installations and local licensing requirements (gas, electrical and plumbing).