Refine results
Level of study
Location
Study Mode
Field of study
Design grid-connected battery storage systems - UEERE0060
- SEVENTEEN MILE ROCKS - 184 Bluestone Cct | Also at 1 other campus
- 2 weeks full-time
Design grid-connected battery storage systems - UEERE0060
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery
Conduct site survey for grid-connected photovoltaic and battery storage systems - UEERE0054
- SEVENTEEN MILE ROCKS - 184 Bluestone Cct | Also at 1 other campus
- 30 hours flexible delivery
- Tuition fees: $880
Design grid-connected photovoltaic power supply systems - UEERE0061
- SEVENTEEN MILE ROCKS - 184 Bluestone Cct | Also at 1 other campus
- 1.5 weeks full-time
- Tuition fees: $880
Conduct site survey for grid-connected photovoltaic and battery storage systems - UEERE0054
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery
Design grid-connected photovoltaic power supply systems - UEERE0061
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery
Grid-connected Battery Storage Systems Designer-Installer Skill Set - UEESS00191
- Moorabbin
- 8 weeks full-time
Grid-connected Battery Storage Systems Designer-Installer Skill Set - UEESS00191
- Wodonga
- 3 days part-time
- Tuition fees: $2,500
Install battery storage equipment power conversion equipment to grid - UEERE0077
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery
Design off-grid photovoltaic/generating set systems - UEERE0063
- EPPING - 19 Quinlan Rd
- 2 days flexible delivery